You are working as a platform designer for a large hosting provider. You are considering the scalability of a solution that is projected as 50 hosts and 1,500 virtual machines. A VCSA is a project requirement. Which of the following is true?
A. The VCSA will scale to 5 hosts and 50 VMs and thus is a risk to project scalability.
B. The VCSA can be configured to use a remote SQL database to meet project scalability.
C. The VCSA should be configured to use a remote DB2 or Oracle database.
A functional requirement in a design requires management, IP-based storage, vMotion, and virtual machine traffic to be physically separated. Which option best fulfills the functional requirement?
A. Using a single virtual switch, applying VLANS for each traffic type, and configuring the physical adapters to use different physical switches
B. Using distributed virtual switches
C. Using a different virtual switch for each type of traffic and having all network adapters use the same physical switch
D. Using a different virtual switch for each type of traffic and having the physical adapters use different physical switches
When considering server consolidation, plan on running ___________ vCPUs per core.
A. 1 to 2
B. 3 to 4
C. 4 to 6
D. 6 to 8