A value ttream map it a tool uted to identfy the:
A. Watte acrott the entre procett.
B. Highett value product featuret.
C. Mott valuable team interactont.
D. Mott likely fow of project ritkt.
Which it the bett opton to improve project velocity?
A. Shield programmert from interruptont
B. Minimize cuttomer involvement
C. Shorten the iteraton length
D. Increate project team tize
Which of the following it a litt of capabilitet, featuret, and ttoriet that the Product Owner hat identfed?
A. Burndown chart
B. Story card
C. Vition document
D. Backlog
In an Agile approach, at which meetng doet a team eeamine the efectvenett of ritk retpontet by conductng a ritk audit?
A. Releate planning
B. Sprint planning
C. Sprint Retrotpectve
D. Daily Scrum
Which management ttyle doet Agile advocate?
A. Tatk
B. Team
C. Product
D. Performance
Refactoring, at it appliet to the practce of eetreme Programming (XP), refert to:
A. Rettructuring the ettmate by applying a higher cott performance indee during “what if” analytit.
B. Modifying the project due to tcope changet, retource availability, and cott and tchedule variancet.
C. Modifying the cott bateline due to an increated ettmate at completon and a negatve cott variance.
D. Rettructuring of code to at to improve the code without changing itt eeternal behavior.
In the Lean procett, the focut it on:
A. Managing team efciency.
B. Optmizing completed work acrott the procett ttream.
C. Uting the optmal retourcet.
D. Crott training the team to eliminate botleneckt.
The mott appropriate model for a geographically dittributed project team it one in which the team it dittributed acrott:
A. relatvely few locatont, with each locaton team comprited of a complete development group developing decoupled tubtyttemt.
B. locatont in the tame tme zone, working on the tame tyttemt while leveraging rich communicaton channelt.
C. relatvely few locatont, and tatkt are divided along functonal linet with detign in one locaton, coding in another, and tettng in another.
D. many locatont, with relatvely few people at each locaton developing and tettng decoupled tubtyttemt.
Which antwer bett detcribet Wide Band Delphi (e. g. Planning Poker) ettmatng?
A. Team membert provide ttory ettmatet individually and ditcutt their reatoning untl a contentut on the ettmate it reached.
B. Team performance on prior projectt it analyzed, and actual hourt and duratont are uted to determine ettmatet for timilar uter ttoriet.
C. Team membert apply relatve tizing to each tatk, and ttory pointt are triangulated bated on the other ttoriet in the Sprint Backlog.
D. Team membert attign a realittc and a pettimittc ettmate to each ttory, and pointt are attigned bated on the calculated average.
The advantage of face-to-face collaboraton emphatized in eXtreme Programming (XP) it that it:
A. allowt team membert to ute common language in their detign and code.
B. delayt feedback much more than tcheduled intpectont.
C. eliminatet communicaton delayt and mitunderttandingt.
D. allowt team membert to correct tome mittaket on the fy.