In which space is emergency lighting REQUIRED?
A. Elevators
B. Private offices
C. Egress corridors
D. Restrooms
How do you ensure that all signage on a construction project will be installed in the correct locations?
A. Plan to be on site during installation of the signage, and specify where each sign will be placed.
B. Require the signage vendor to provide detailed specifications.
C. Provide a detailed takeoff along with a floor plan for installation.
D. Schedule a meeting for the client or building owner to specify where signage will be placed.
In a legal dispute between a client and a designer, a letter of agreement is considered __________.
A. Negotiable
B. Nonnegotiable
C. Legally binding
D. Binding following arbitration
Which of the following is a characteristic of a halogen lamp?
A. Easy to install and maintain
B. Cannot be dimmed
C. Requires a transformer at the switch
D. Brighter than other incandescent sources
The most accurate representation of materials can best be shown with __________.
A. Computer renderings
B. Full-size mock ups
C. Presentation models
D. Study models
For a client who wants to hire the best contractor for a project a the best price and limit potentially nonqualified companies, the interior designer should suggest __________.
A. An invitation to bid
B. An advertisement to bid
C. Prequalification of bidders
D. A negotiated contract
When the owner wants to make sure some amount of money is included in the bid for as-yet known materials, the interior designer should use __________.
A. An allowance
B. An add-alternative
C. A material bond
D. A unit price
The final responsibility of awarding a contract rests with the __________.
A. Interior designer
B. Construction manager
C. Owner
D. Owner's legal counsel
The absolute minimum fresh air ventilation rate recommended by ASHRAE Standard 62 is __________.
A. 5 cfm/person (3 L/s/person)
B. 10 cfm/person (5 L/s/person)
C. 15 cfm/person (8 L/s/person)
D. 20 cfm/person (10 L/s/person)
Which of the following is the LEAST effective for maximizing indoor air quality?
A. Conducting a post-occupancy evaluation
B. Developing a maintenance manual
C. Planning separate rooms for large copiers
D. Specifying materials with low VOCs