Refer to exhibit.
You are installing three Synergy frames for a customer PoC in the configuration shown. The composer ids unable to discover the frames What is the mostly likely cause of the problem?
A. Another composer is needed frame3.
B. Composer 2 is in the wrong frame.
C. The management network should be connected to the top and bottom frames.
D. The management ring should be connected using the FLM link ports.
You customer has completed a successful proof of Concept (PoC) consisting of a single frame with dual composers and virtual Connect SE 40GB F8 modules. The customer wants to: *add a second frame before they move into production *have unified management *have separate logical enclosure for each frame
What are basic steps to add the second frame?
A. Move the standby composer to the second frame
B. Disconnect the existing management ring, and then cable the FLM (frame link module) in the first frame to the FLMs in the second frame
C. install a satellite module in the first frame
D. Move the bottom VC module from the first frame to the second
E. Move one of the uplinks from the FLM in the first frame to a FLM in the second
Your customer is building out their object-based storage solution. They initially developed object store
using DL380 Gen 9 servers but are now looking for a solution that is purpose built to provide the additional
storage.
What solution should you recommend?
A. DL580 Gen10
B. Apollo 4510 Gen 10
C. ML350 Gen 10