HOTSPOT
A customer temporarily needs to add an additional network connection to a provisioned server that is being actively managed by OneView. The server is currently powered down. Which top level option should they click as the first step?
Hot Area:
What is required to enable Jitter Smoothing technology? (Choose two.)
A. HPE Apollo
B. ProLiant Gen 10
C. HPE Synergy
D. HPE Cloudline
E. iLO5 Advanced
A customer needs a VDI solution. The amount of compute per U of rack space will be a key point in their solution selection.
Which HPE product would be an ideal solution as part of your RFP response?
A. HPE Apollo 4510 Gen10
B. HPE Apollo 4200 Gen9
C. HPE SY480 Gen10
D. HPE DL580 Gen10
A customer recently purchased HPE ProLiant Gen10 servers, but finds that their application does not appear to benefit from the newest Xeon processors. Which features should be configured in the BIOS to overcome the issue?
A. Server Profile Templates
B. iLO CNSA Mode
C. Workload Profiles
D. High Precision Event Timer
Your customer boots to the HPE Smart Scripting toolkit via PXE to automatically configure their new systems. They are moving to a new data center which has a policy that PXE boot will not be allowed in the environment.
What is the closest alternative to use when deploying Gen10 in their new data center?
A. iLO Federation running the Smart Scripting Toolkit scripts
B. iLO RESTfull API running the Smart Scripting Toolkit scripts
C. Insight Control server provisioning running the Smart Scripting Toolkit scripts in a build plan
D. HTTP/HTTPS Boot to the Smart Scripting Toolkit
A customer wants to use the automated zoning feature of HPE OneView. A customer complains that this functionality does not work, even if 3PAR and CPGs are added to HPE OneView.
Which other steps must be performed before automated zoning can be used? (Choose two.)
A. Enable Data Center Bridging functionality on VC modules
B. Apply extended FC licenses to Virtual Connect downlink ports using HPE OneView
C. Activate WBEM Providers on supported 3Par arrays
D. Add the supported SAN Manager to HPE OneView
E. Associate managed SANs with a FC or FCoE network
A customer uses VLANs in their network. They recently acquired another company and need to extend the number of VLANs to 7400 to accommodate the growth. What should you advise?
A. Implement an IPv6 only environment
B. Edit the /etc/network/config file, and set VLAN_LIMIT=7401
C. Upgrade the NICs to models that support RoCE
D. Transition to a VXLAN or NVGRE network configuration
A customer requires the ability to act rapidly on ideas by creating, consuming, and reconfiguring new solutions, experiences, and business models. Which HPE server platform best meets their needs?
A. HPE ProLiant Rack Servers
B. HPE Synergy
C. HPE SimpliVity 380
D. HPE BladeSystem C7000
A customer completed a successful Synergy PoC consisting of a single frame with dual composers and dual Virtual Connect SE 40Gb F8 modules. The customer needs additional frames to allow for growth. They require 20GB to each
compute module.
How may additional frames can be added to the existing logical enclosure?
A. 1
B. 2
C. 3
D. 5
You need to consolidate multiple BOMs, power requirements, and changing criteria of a Converged System due to the review of multiple reference architectures on Microsoft Exchange Server 2016. Which tool should you use?
A. HPE Sizer for Microsoft Exchange Server 2016
B. HPE Converged Infrastructure Solution Sizer Suite
C. HPE Sizer for Server Virtualization
D. Single Point of Connectivity Knowledge (SPOCK)