A customer recently purchased an HPE Moonshot chassis to host its internal website. Subsequently, the customer reports difficulties deploying new cartridges in an efficient manner. The customer suggests exchanging the solution for a more traditional server platform.
What can the architect demonstrate to the customer to help solve the problem while preserving the validity of the original design solution?
A. how to use SCCM to provide a graphical installation method for new nodes
B. how to use VSP to provide a graphical installation method for new nodes
C. how to add an mRCA module to provide a graphical installation method for new nodes
D. how to use iLO remote console to provide a graphical installation method for new nodes
Which statement describes the availability metrics for an HPE system's high availability?
A. All standard HPE servers are designed for 99.9999% availability.
B. A system consisting of HPE standard servers with an availability of 99.9999% and a storage system with an availability of 99.99% will have a combined availability of 99.99999%.
C. A system with an availability of 99.99% can be expected to be in operational for 6 minutes or fewer per year.
D. A system with an availability of 99.999% will statistically not have an unscheduled downtime of more than 1 hour total in 10 years of operation.
A customer plans to use Insight Control server provisioning and HPE OneView for vCenter Server. The vCenter Server manages one c7000 enclosure with 16 server blades running VMware ESXI. Which licensing option should the architect include in the proposal?
A. one HPE OneView Standard license for each managed server and one HPE OneView for vCenter Server license for the c7000 enclosure
B. one Insight Control server provisioning license for each managed server
C. one Insight Control server provisioning license for each managed server blade and one HPE OneView for vCenter Server license for the entire c7000 enclosure
D. one HPE OneView Advanced license for each managed server
An architect is designing an HPE Apollo 6000 solution to support a customer application. The architect is choosing between the HPE ProLiant XL230a and the XL250a compute tray. What is one reason for choosing the XL250a tray?
A. The application is single-threaded.
B. The application requires high storage capacity.
C. The application uses high amounts of memory.
D. The application requires GPU acceleration.
A customer has a large Oracle-based ERP solution that runs on HPUX and multiple rx2800 i2 servers. The customer plans to move to an open source solution to reduce operating expenses. The customer needs the ability to deliver incremental capacity and needs to avoid incremental Oracle licensing costs. Which HPE Server solution will help meet the customer's needs?
A. HPE Apollo 6000 System
B. HPE Superdome X
C. HPE BladeSystem c7000 with BL460G Gen9 Servers
D. HPE Apollo 4500 System
Which of the HPE Transformation Areas should the architect discuss when the customer's concerns span backup and recovery, high availability, and disaster recovery?
A. Transform to a hybrid infrastructure.
B. Empower the data-driven organization.
C. Protect the digital enterprise.
D. Enable workplace productivity.
A customer has an HPE Integrity Superdome X system with an nPartition that has been provisioned with a supported OS and application.
What first detects data corruption caused by an installed DIMM module?
A. the XNC2 controller in the internal fabric
B. the application using the data
C. the OS installed on the nPartition
D. the Superdome X firmware
A proposed solution includes the HPE Moonshot-4QSFP+ Uplink Modules. The customer informs the architect that the planned purchase of 40GbE switches has been postponed. The customer still intends to purchase 40GbE switches within a year, but in the meantime, existing 10GbE switches will be used. These switches are HPE network switches located 25 meters from the location of the racks that house the HPE Moonshot Solution. The customer needs 30Gb/s bandwidth.
Which action should the architect recommend to allow the customer to deploy the solution immediately and easily take advantage of 40GbE when deployed later?
A. Swap in HPE Moonshot-16SFP+ Uplink Modules
B. Replace the QSFP+ transceivers with SFP+ transceivers
C. Add QSP+/SFP+ adaptor kits to the design
D. Replace the DAC cables with DAC splitter cables
An architect is presenting a file-based transcoding solution to a customer. The solution will include a single HPE Moonshot 1500 chassis that will be directly connected to HPE Apollo 4530 storage via 4 x QSFP uplinks.
The customer is concerned about the significant traffic that will generated between the HPE Moonshot 1500 chassis and the HPE Apollo 4530 storage.
Which factor should the architect design into the solution to address the customer's concerns?
A. Setup the solution so the cartridges use both adapters
B. Add two HPN 5930 ToR switches with IRF
C. Add uplinks as the workload increases
D. Install cartridges that have GPUs
An architect is positioning a scale-up solution to a customer. The solution will reduce the customer's server sprawl by reducing 100 legacy virtualization hosts while improving performance. Which HPE platform provides an appropriate solution?
A. HPE Integrity Superdome X
B. HPE Apollo Systems
C. HPE Synergy
D. HPE Hyper-converged systems