Want to pass your VxRail Appliance 4.x Deployment and Implementation E22-285 exam in the very first attempt? Try Pass2lead! It is equally effective for both starters and IT professionals.
VCE
You are reviewing a VxRail Pre-Installation Site Checklist. What conclusion can be drawn about the VxRail deployment from the exhibit?
A. Top of Rack (ToR) switches will use two uplink ports
B. Upstream switches will have two ISLs
C. Two Top of Rack (ToR) switches will be used
D. Two Upstream switches will be used
A company wants to deploy VxRail on V Series nodes as a proof-of-concept (POC). Only one Top of Rack (ToR) switch has been provided for the POC. What is the Dell EMC best practice recommendation in this situation?
A. Connect the first host NIC to the ToR switch. Leave the second host NIC un-cabled.
B. Connect each host NIC to a port on a different switch packet buffer bank on the ToR switch. Balance the ports across two packet buffer banks.
C. Inform the company that the POC cannot proceed without a second ToR switch.
D. Connect the first host NIC to the TOR switch. Daisy chain the second NIC between hosts.
A 4 node VxRail solution will be deployed. Based on the exhibit, what will be the host name assigned to the last node in the cluster?
A. MyVxRaild.mycompany.com
B. MyVxRail-4.mycompany.com
C. MyVxRail-d.mycompany.com
D. MyVxRail04.mycompany.com