Want to pass your Associate - PowerEdge DEA-41T1 exam in the very first attempt? Try Pass2lead! It is equally effective for both starters and IT professionals.
VCE
A backup administrator is migrating their tape drive backup solution from LTO-4 to LTO-6 generation. Both LTO-3 and LTO-4 media are presently in use. All LTO-4 drives are to be replaced by LTO-6 drives, but the administrator plans to avoid replacing a maximum amount of the tapes already in use.
What should the administrator do to accomplish this task?
A. Back up all critical data on at least LTO-4 tapes in order to be read it from their new LTO-6 drives.
B. Nothing, the administrator will still be able to read any tape currently in use will their LTO-6 drive and will be able to retrieve data if needed
C. Back up all critical data from LTO-3 tapes to LTO-4 tapes Next, back up LTO-4 tapes to LTO-5 tapes Next, back up LTO-5 tapes to LTO-6 tapes
D. Back up all critical data from LTO-3 tapes to LTO-4 tapes Next, back up LTO-4 tapes to LTO-5 tapes
A server room has two power grids, A and B. PSU1 on each server is on grid A, and PSU2 is on grid B. Grid B has significantly lower load compared to grid A. What is the most likely cause of the unbalanced power load?
A. PSU1 is a higher wattage power supply than PSU2
B. Hot spare feature is enabled in power supply configuration
C. PSU1 is always the primary power supply
D. UPS and PDU are not installed to balance the load
A PowerEdge 14G server administrator has to shut down a server for urgent intervention. They don't want to risk any data loss but don't know the OS password. What steps should be taken?
A. Connect to Lifecycle Controller > Server management > Send OS shutdown command
B. Connect to iDRAC > Dashboard tab > click Graceful Shutdown
C. Connect to iDRAC > Dashboard tab > click Power Off System in the dropdown menu
D. Connect to Lifecycle Controller > Server management > Power Off System