Which two pieces of information should always be recorded in the stakeholder list? (1 Point)
A. Importance of the stakeholders
B. Role designation
C. Length of service with a company
D. Disciplinary superior
E. References to previously conducted projects
As a requirements engineer, you deal with a diverse range of requirements. A template for natural language functional requirements can help you to formulate different forms of system activities in a more precise way. Which two kinds of system activities are among those supported? (1 Point)
A. User interaction
B. Technical requirement
C. Quality requirements
D. Independent system activity
E. System requirement
Requirements documentation can either be natural language or model-based. Which two statements are most applicable? (2 Points)
A. If documentation is model-based, natural language documentation can be dispensed with.
B. As models are more formal, they offer a higher degree of uniqueness compared to natural language.
C. In requirements engineering models are more suitable than textual descriptions to reduce the complexity of the entity being considered.
D. When deciding between model-based and natural language documentation, model-based is preferable.
One task of the requirements engineer is negotiation of requirements. At this point, conflicts between the stakeholders may be discovered. These must then be resolved. In this process, a differentiation is made between various kinds of conflict. Which two of the listed conflicts are least suitable for handling by the requirements engineer? (1 Point)
A. Subject matter conflict
B. Value conflict
C. Architectural conflict
D. Cost conflict
E. Structural conflict
Validating requirements is one of the main activities of requirements engineering. Which four of the following techniques are suitable for requirements validation? (2 Points)
A. Stakeholder analysis
B. Walk through
C. Ranking
D. Monitoring
E. Decomposition
F. Apprenticing
G. Generalization
H. Validation by using an interface prototype
I. Perspective-based reading
J. Inspection
K. Visualization
You are employed as a requirements engineer in a company in the logistics sector and are involved in a project that aims to replace a legacy application for distribution and shipment of goods with a new system. A colleague has already created a context diagram. You are assigned to check this. What are your thoughts about this? Indicate for each statement whether it is true or false. (3 Points)
A. A, C, F, G
You have been commissioned to analyze a change request for its possible impact. Which of the following aspects must be analyzed for this? (2 Points)
A. B, C, E, G
You are project manager for a system that your company is creating for the military in the field of logistics. A requirements engineer has been assigned to your project but does not have all the desirable skills for this role. In respect to the attributes of the requirements engineer, which of the following statements implies the greatest risk for the requirements engineering? (1 Point)
A. The requirements engineer is not familiar with the military ranks and so cannot deal adequately with the hierarchical sensitivities.
B. The requirements engineer does not have detailed knowledge of the military norms and standards that should be applied to the system.
C. The requirements engineer has no solid project management training.
D. The requirements engineer is introverted and has no knowledge of requirements elicitation and documentation.
You are assigned to carry out and document a system and context delimitation for a software system that is to be developed. What diagram is least suited for the representation of the delimitation? (1 Point)
A. Class diagram
B. Use case diagram
C. State diagram
D. Context diagram with data flows
Which of the following elements are elements of a state diagram and which are not? Please indicate true or false. (1 Point)
A. A, C, E, H, I