Want to pass your ISEB ISTQB Certificate in Software Testing BH0-004 exam in the very first attempt? Try Pass2lead! It is equally effective for both starters and IT professionals.
VCE
What is the MAIN benefit of designing tests early in the life cycle?
A. It is cheaper than designing tests during the test phases.
B. It helps prevent defects from being introduced into the code.
C. Tests designed early are more effective than tests designed later.
D. It saves time during the testing phases when testers are busy.
Which of the following BEST describes the difference between an inspection and a walkthrough?
A. Both inspections and walkthroughs are led by the author.
B. An inspection is led by a moderator and a walkthrough is led by the author.
C. Both inspections and walkthroughs are led by a trained moderator.
D. A walkthrough is led by the author. The author is not present during inspections.
What is beta testing?
A. Testing performed by potential customers at the developers location.
B. Testing performed by potential customers at their own locations.
C. Testing performed by product developers at the customer's location.
D. Testing performed by product developers at their own locations.