Which statement(s) are incorrect about Fractional Factorial Designs?
A. A Half Fractional Design for 5 factors has the same number of experimental runs as a Full Factorial Design for 4 factors assuming no repeats or replicates or Center Points
B. Quarter Fractional experiments can exist for those with 4 factors
C. Resolution V design is desired while controlling costs of experimentation
D. Half Fractional experiments do not exist for those designs with only 2 factors
The class score distribution of schools in a metropolitan area is shown here along with an analysis output.
Comment on the statistical significance between the Means of the two distributions. Select the most appropriate statement.
A. The two class Means are statistically different from each other
B. The two class Means statistically not different from each other
C. Inadequate information on class Means to make any statistical conclusions
D. A visual comparison shows that class Means are not statistically different
E. A visual comparison shows that class Means are statistically different
The most appropriate type of FMEA for a product before going into manufacturing is a ___________ FMEA.
A. Design
B. Consumer
C. Survey
D. Test Process
Two of the key deliverables for the Measure Phase are a robust description of the process and its flow and an assessment of the Management System.
A. True
B. False
Which statement is most correct for the Regression Analysis shown here?
A. The Regression explains 50.8% of the process variation
B. The air-fuel ratio explains most of the TurbineOutput variation
C. This Simple Linear Regression explains 98+% of the process variation
D. This Multiple Linear Regression has four statistically significant independent variables
An operator checks that all boxes being packed contain enough products to fill the box. However, each box getting filled has a different number of products in it. This is a Reproducibility problem, not a Repeatability problem.
A. True
B. False
As a means of measuring the effects on other areas of a process as a result of changes in the primary metric we also define and track ________________.
A. Parallel process metrics
B. Secondary metrics
C. Tertiary metrics
D. Industry standards
Production Line 1 is able to complete 500 units per shift. Production Line 2 is able to finish 1,500 units per shift. Production Line 2 is 3 times faster than Production Line 1. This analysis is an example of ______________ Scale Data.
A. Nominal
B. Ratio
C. Ordinal
D. Interval
Which of the following is categorized as strength?
A. High cost structure
B. Unfulfilled customer needs
C. New regulations
D. Resources and capabilities
Which of the following does not come under the tools and techniques for a project charter?
A. Expert judgment
B. Project management information system
C. Organizational process assets
D. Project management methodology