The management of an international company perceives the implementation of SAP ECC 6.0 with the New General Ledger Accounting as an opportunity to standardize their global processesand still be in compliance with statutory local reporting. What are some of the key design decisions that support their global requirements?(Choose three)
A. They should design one leading ledger and one non-leading ledger to capture parallel accounting reporting requirements.
B. They should adopt a master data governance strategy to globally enhance the integrity of master data.
C. They should use one global controlling area and assign the credit control areas to the controlling area.
D. They should define multiple controlling areas and assign company codes to the controlling areas.
E. They should use one standard global chart of accounts and one global controlling area and assign the company codes to the controlling area.
Where do you have to activate commitment management to enable posting commitments on cost centers?
A. Cost center master record
B. Controlling area
C. Standard hierarchy
D. Cost element master record
You have completed the basic configuration of SAP Solution Manager and defined the solution landscape. Which of the following scenarios will work without further configuration steps?(Choose two)
A. Business Process and Interface Monitoring
B. Early Watch Alert
C. Change Request Management
D. Maintenance Optimizer
A customer wants you to explain the results of the preliminary costing of a production order. How are the results determined?
A. The actual quantities are valuated with plan values.
B. The costs are determined by the cost estimate of the reference order.
C. The standard cost estimate is copied from the material master and adjusted by the order quantity.
D. The quantity structure in the production order is valuated by the costing variant settings.
Which applications are integrated with variant configuration in SAP ERP?(Choose three)
A. ERP Quality Management (QM)
B. ERP Finance (Fl)
C. Internet Pricing and Configurator (IPC)
D. ERP Pricing (SD)
E. ERP Costing (CO)
Which of the following statements regarding the SAP NetWeaver platform are correct?(Choose two) A. SAP NetWeaver can power both SAP and non-SAP solutions
B. SAP NetWeaver's predefined IT Scenarios describe the allocation of functionality to either the ABAP or Java stack for execution
C. SAP NetWeaver is an application platform that serves as the foundation for integrating solutions on several different levels
D. SAP NetWeaver enables process integration through modules such as Business Intelligence and Knowledge Management
On what does SAP Early Watch Alert report?(Choose two)
A. System configuration
B. Business processes
C. Performance trending
D. Hardware failures
Select the benefits of SAP Solution Manager from the list of items below. (Choose three)
A. Integration of SAP Solutions
B. Reduced cost of operations
C. Separation of SAP solutions
D. Faster ROI
E. Lower ROI
What happens when a vendor's invoice is posted?
A. The payment is applied to the vendor's account.
B. The standard price in the material master is recalculated.
C. The goods receipts/invoice receipts (GR/IR) account within the general ledger is debited.
D. An accounting document is generated that posts directly to the accounts payable account within the general ledger.
A customer, who already runs SAP ERP, wants to implement a BI solution. You are building a presentation in order to show the advantages of the SAP BI solution.
What would be the key benefits of SAP BI in your presentation?(Choose two)
A. SAP BI always provides real-time data from operative SAP applications.
B. SAP BI enables Online Transaction Processing (OLTP) for the staging of information from large amounts of operative and historical data.
C. SAP BI, with its delivered Business Content, can be easily set up to extract data from SAP applications.
D. SAP BI easily integrates information from various operative SAP applications and non- SAP applications.