Philip Crosby's book ___________ articulates the Four Absolutes of Quality Management.
A. Hygiene Motivation Theory
B. Quality is Free
C. Peopleware
D. Out of Crisis
Which is NOT a commonly used Quality Management tool?
A. Fishbone Diagram
B. CSSR Report
C. Pareto Chart
D. Control Chart
Which of the following statements best characterizes the Quality Management practice called Benchmarking?
A. The ISO term for progress measurement
B. Comparing planned project practices to those of other projects
C. A technique used to test certain types of electronic equipment
D. The difference between grade and quality
E. The measurement of customer satisfaction
In the EVM concept, a SPI greater than 1 indicates:
A. Less of the budget was consumed for the work
B. Excess of the budget have been spent for the actual work completed
C. 100% or less of the planned time has been used to complete the scheduled work
D. More than planned time has been used to complete the scheduled work
Which of the following is an example of a measure?
A. Defect Density
B. Proposal to Contract Conversion Ratio
C. Number of Resignations
D. Attrition Rate
Critical Assumptions are key factors for the project that are:
A. Outside the control of the project team
B. Within the control of the project team
C. Irrelevant whether the project team controls them or not
Mary's requirement that she should be able to change the screen color whenever she wants represents which of the following Quality Requirements?
A. Reusability
B. Flexibility
C. Portability
D. Maintainability
Which of the following is NOT an example of Static Testing?
A. Reviews
B. Inspections
C. User Acceptance Testing
D. Walkthrough
A program validates a numeric field as follows:
Values less than 100 are rejected, values between 100 and 200 are accepted, values greater than or
equal to 201 are rejected.
Which of the following input values cover all of the equivalence partitions?
A. 100, 110, 199
B. 3, 200, 210
C. 80, 100, 201
D. 100, 200,201
A technique for capturing the functional requirements of systems through the interaction between an Actor and the System is called:
A. System Test Case
B. Use Case
C. Acceptance Test Case
D. Data Flow Diagram