A cloud architect is writing an implementation plan for deployment of a clustered vRealize Automation deployment that will use a third-party load balancer.
Which two steps should the architect include within the implementation plan to ensure a successful deployment of vRealize Automation? (Choose two.)
A. Disable all secondary nodes from the load balancer pools
B. Create and configure the monitoring of vRealize Automation and vRealize Orchestrator
C. Ensure all the SAN certificates for vRealize Suite are available
D. Enable all non-primary nodes on the load balancer
E. Turn off the health monitors or change them temporarily to default to ICMP and ensure traffic is still forwarding to the primary node
A design for a Cloud Management solution includes a section that describes the association of vRealize Operations solution with a remote collector for the purpose of gathering performance and usage metrics.
Which area of the design would contain that section?
A. Logical
B. Conceptual
C. Requirements
D. Physical
A customer wants to design and deploy Workspace ONE Access to provide multi-tenancy for vRA 8.x
deployment.
Which two designs decisions would achieve the customer's requirement? (Choose two.)
Note: SAN stands for Subject Alternative Name.
A. Configure a certificate with multiple SAN entries for Workspace ONE Access.
B. Configure SSL termination on the load balancer for Workspace ONE Access.
C. Configure SSL bridging on the load balancer for Workspace ONE Access.
D. Configure SSL passthrough on the load balancer for Workspace ONE Access.
E. Configure a certificate with a single SAN entry for Workspace ONE Access.
A company has recently completed an audit and has found that there are many virtual machines in their production environment which no longer appear to be in use. To prevent this from happening in future, the company is deploying vRealize Automation and would like all provisioned VMs to meet following requirements:
VMs to have a default lease of 90 days and no more than 365 days Lease policy can be overridden on case by case basis Upon initial lease expiry, the VM should be kept for 10 days after which they will be destroyed
Which policy design will meet the technical requirements?
A. Create a lease policy with the organization scope, setting 90 days lease, 365 total lease and grace period to 10 and a hard enforcement
B. Create a lease policy with the organization scope, setting 90 days lease, 365 total lease and grace period to 10 and a soft enforcement
C. Create a lease policy with the project scope, setting 90 days lease, 365 total lease and grace period to 10 and a soft enforcement
D. Create a lease policy with the project scope, setting 90 days lease, 365 total lease and grace period to 10 and a hard enforcement
An architect is responsible for designing a new Operations Management solution for a customer. The
customer has provided the following information about their existing VMware Software Defined Data
Center (SDDC) environment:
The customer uses a SaaS-Based Service Desk solution.
The existing environment is located across two geographical regions.
In each region, the customer already has deployed a vSphere-based virtual environment that spans two
well connected physical locations.
The customer has recently upgraded all of their licenses to VMware vCloud Suite Advanced subscription.
The customer has already successfully deployed and configured a vRealize Operations 8 solution in each
region.
The customer would like to ensure that:
All vSphere log events must be captured, stored locally and forwarded to a third-party log management
solution to ensure regulatory compliance.
Specific vSphere log event's can be captured within a region, monitored and then trigger alerts direct to the
Service Desk which can then be assigned to regional support teams.
Operations monitoring for all of the VMware SDDC solution can be consolidated into a single user
interface.
Which three recommendations should the architect make to meet the requirements? (Choose three.)
A. Configure vRealize Operations 8.x and vRealize Log Insight 8.x integration.
B. Configure vRealize Operations 8.x and vRealize Log Insight Cloud integration.
C. Deploy vRealize Operations Cloud and configure Federated Analytics.
D. Deploy vRealize Log Insight 8.x and configure the vSphere integration.
E. Deploy vRealize Log Insight Cloud and configure the vSphere integration.
F. Deploy vRealize Operations Cloud and vRealize Log Insight 8.x integration.
An architect is designing a vRealize Log Insight cluster for an organization with the following requirements:
The organization has an external load balancer available to provide load balancing for various
requirements.
Due to budget constraints the organization need to reuse existing environment as much as possible.
What should the architect choose as the load balancing solution for the vRealize Log Insight cluster?
A. Use the integrated load balancer
B. Deploy a new external load balancer
C. Use the existing external load balancer
D. Use both integrated and external load balancers
An architect is responsible for creating the design for a Cloud Monitoring solution that will be used to
monitor a greenfield VMware Software-Defined Data Center (SDDC). During a requirements gathering
workshop, the Service Owner provided a list of solution requirements:
The solution must support a monthly availability target of 99.9%.
The solution must support the monitoring of 1000 virtual machines across two data center locations.
The solution must support the retention of live data for at least 12 months.
The solution must be redundant to a minimum of N + 1 including during planned maintenance.
The Recovery Time Objective (RTO) of solution is 4 hours.
Given the information from the Service Owner, which two statements would be considered functional requirements? (Choose two.)
A. The solution must support the monitoring of 1000 virtual machines across two data center locations.
B. The Recovery Time Objective (RTO) of solution is 4 hours.
C. The solution must support a monthly availability target of 99.9%.
D. The solution must be redundant to a minimum of N + 1 including during planned maintenance.
E. The solution must support the retention of live data for at least 12 months.
An organization has onboarded a new business unit whose role is to test the applications 5 days prior to the release date. The Service Broker administrator should allow a 2-day extension for these deployments before they are deleted permanently.
Which two options must be configured in the lease policy to meet the requirements? (Choose two.)
A. A maximum lease of 5 days
B. A maximum lease of 7 days
C. A total maximum lease of 7 days
D. A total maximum lease of 5 days
E. A grace period of 5 days
A customer will use their vRealize Automation solution to provision and manage both production and development workloads.
During workshops, the customer has communicated the following information about the environment:
The production and development workloads are deployed to separate vCenter Servers.
Three different user groups have been identified for access to the solution: Application Developers,
Application Owners, and Infrastructure Operators
The customer has communicated the following requirements:
Only Application Owners and Infrastructure Operators may be permitted to deploy production workloads.
A limit should be applied to the number of development workloads concurrently deployed by each user
type.
Application Owners must not be able to view or modify another user's deployment(s).
In addition to the creation of separate Production and Development Cloud Zones, which three design
decisions meet the requirements? (Choose three.)
A. Add the Application Owners and Infrastructure Operators groups to the production project.
B. Define a Cloud Assembly project for each user group.
C. Define a Cloud Assembly project for production and another for development.
D. Define an instance limit for projects using the development Cloud Zone.
E. Define a priority of 0 for the production Cloud Zone in the project used by Application Developers.
F. The deployment sharing option should be turned off for the Application Owners project.
A customer wants to implement vRealize Suite Lifecycle Manager (vRSLCM) as a part of a new SDDC
deployment.
The customer has two physical data centers and number of branch offices.
The customer has recently purchased Hyper-converged Infrastructure (HCI) hardware that has to be
implemented and configured.
The customer has a target availability Service Level Agreement (SLA) of 99.99%, measured quarterly, for
the management components.
Which recommendation should the architect make to achieve the requirements?
A. Deploy a 3-node vRSLCM cluster on a vSAN stretched cluster
B. Deploy a vRSLCM appliance in one DC and replicate it to the second DC
C. Deploy a vRSLCM appliance on a vSAN stretched cluster
D. Deploy a vRSLCM appliance on a vSAN cluster